top of page
Network Upgrade/Conversion - Denver, CO
Perform a site survey for each site and install a Zayo 10RU cabinet on a customer supplied H-frame. Make flex conduit connections between the NEMA enclosure (Customer installed) and the 5RU cabinet. Rack and stack the equipment, cable equipment, ground, test and perform node insert.
Site Counter
Cabinets Installed
Cabinets Decommissioned
Fiber Optic Cable Pulled
186
186
n/a
18,540
bottom of page