top of page
Fiber to Tower (FTT) Ethernet Installation & Turn-up - Memphis, TN
Perform a site survey for each site and install a Zayo 5RU cabinet on a customer supplied H-frame. Make flex conduit connections between the NEMA enclosure (Customer installed) and the 5RU cabinet. Rack and stack the equipment, cable equipment, ground, test and perform node insert.
Site Counter
Cabinets Installed
Cabinets Decommissioned
Fiber Optic Cable Pulled
86
86
n/a
n/a
bottom of page